To this end, now the fourth quarter engineering work summarized as follows:
First, the schedule of progress
In the early stage of construction, under the consistent efforts of the whole company, the whole works well and the project has a good trend from safety, quality and progress. However, the processing of raw materials is an important link. , The audit of its materials related to the acceptance of the project safety, progress and other major links. (Materials often problems: 1, the material does not match the original drawings. Refer to the drawings one by one inspection to ensure that the material is correct; followed by raw materials in the production process to increase its efforts to monitor the company to ensure the correct production of materials for the Do not need to do a good job guarantee .2, raw materials approach the corresponding information is not perfect .It is recommended in the process of distribution of materials, the organization of the corresponding information staff to prepare the appropriate information on the vehicle distribution .3, good drawings review, the original design of common sense I would like to set up the company before the corresponding set of leadership, design, materials, engineering (recommended construction team in the conditions permitting, in the event of the construction site, The meeting will be responsible for the corresponding person in charge of a "pre-Conference" for the drawings, contracts, raw materials collection, material distribution co-ordination, design technology, on-site management issues to do a full range of analysis, co-ordination, Responsibilities, unity team strength.
In the foundation construction, the weather and other irresistible factors, is affecting the overall project successfully completed the biggest stumbling block, for this site managers should be based on the actual situation of the site, Party, weather and other factors to do the appropriate adjustments, reasonable arrangements for the construction schedule, Effective measures to catch up with the progress of the system. In this, I also deeply aware of their own shortcomings, the face of rainy weather can not reasonably organize workers to do the preparatory work for the latter part of the progress of the work, the corresponding conditions permitting the corresponding time delay caused by the progress of the project to step up , The corresponding surprise overtime is my own lack of management experience, can not be reasonable and effective deployment of workers to fully implement, so in the future work there are many places need to learn to grow.
Second, the construction safety
Site construction to be able to truly realize that production safety is a business and personal casting too fine in the premise and protection. We can realize the social attitude of "people-oriented, safety first", and can realize the importance and necessity of safety facilities, safety education and prevention. In the early stage of construction, do a good job of worker safety education, the signing of the corresponding labor contract, the security at the end, always bear in mind safety awareness, reserved warehouse project midway construction workers in the process of fall, as the scene responsible for people I can not Shirking responsibility, in the company's leadership under the same concerted efforts to take appropriate emergency measures for the injured in a timely and effective fight for the most valuable time to rescue, making the final health recovery workers to provide a strong guarantee for this I also reflect on their own deep, In the future construction site safety management work, always do a good job "Sambo, four, five edge", the construction of civilization, the safety education of workers, investigation of security risks as the focus of the work and the development of specific security Implementation of programs and measures for the smooth conduct of escort the project.
Third, the construction quality
A hundred years, quality-oriented. project, with the already completed, but still left a lot of thorny issues, such as: roof tile sun lap at the water leakage, wall windows leaks ... ... to the party's production has caused some impact, but also for the company The unnecessary loss, which I am deeply guilty, has been working to repair. In view of the above, I think in the construction process of the construction process to monitor their time, to avoid the workers paralysis thinking, to work with the team signed a technical agreement, if necessary, the quality of the agreement signed and develop the appropriate quality inspection cycle, found in the construction process quality defects The implementation of the implementation of the settlement, and truly quality problems in the dynamic management of quality inspection within. In strict accordance with national norms, standards and household acceptance criteria for the construction, the quality of the implementation.
As a graduating student this year, I am honored to join this company, and today my probationary period has been over 3 months, and in the past three months, I initially worried about graduating as a new member of societyStudents can not get along well with people, how to do their own work, but in this company, where the leadership, where my colleagues gave me great help in the company harmonious working atmosphere, solidarity in the corporate culture , So I am very easy to change from a student into a qualified social professional. Thank you, colleagues and leadership here.
Since joining the company in September of this year, my practical work experience is basically zero, only the theoretical knowledge of the school professor, when I first came into contact with the supervision work, I was not surprised, because the actual work and There is a big difference between the textbooks. I have been very confused, but some of my colleagues under the guidance of patience, I quickly adapted to the site of the work environment, but also understand the work of a project supervisor responsibilities.
In the work of the site supervision, I am strict with myself, do not let any details of the project, so that everything must personally check the principle of access to the company colleagues and leaders of the recognition, but also access to the construction unit recognition, Professional knowledge and practical aspects of the work, the problems encountered, humbly ask colleagues to continue to enrich themselves, to contribute to the company.
In the supervision of the work, as a new graduate into the community, there are a lot of small difference, these experiences make me continue to grow, in dealing with various problems at the same time, so that their knowledge of the surface continue to expand, Consider the issue more comprehensive, to avoid the same problem in the future. I would like to thank my colleagues who have contributed to the mistakes and reminders and guidance of my work.
After three months of work, I now have to be able to independently deal with some of the engineering problems, the normative work drawings are also very familiar with, you can draw their own drawings and analysis drawings.Make judgment on the engineering procedure. Of course, I have a lot of problems, in dealing with the relationship between the construction unit needs to be further improved, the group cooperation is relatively poor, need to work in the future to further improve their ability.
After three months of work, I am in this company to work pride and pride, more hope to become a member of the company, to achieve their goals in life, reflect their value in life. I will be humble attitude and full of enthusiasm to do my own work for the company to create value, with the company to show a better future!
时间过的很快,一转眼20__年又要过去了,在这年终岁末之际,回顾自我一年来的监理工作生活,有苦过,有累过……
在过去的一年里,在分公司与项目部领导的指导与带领下,我认真坚持正确的工作指导思想,树立“让业主满意”的的服务宗旨,尽心尽职,兢兢业业,努力完成工作,公司监理的年终工作总结。
1月份至8月份末,在连云港项目部王总的带领下,为连云港东海电信业主做出了优质的服务,在监理工作中,严格要求自我,树立自身强烈的职业职责心,对待工作不马虎,不偷懒,尽自我最大的努力把监理工作做好,遇到不懂或者自我不确定的事情,及时向公司中的经验丰富的老前辈请教,及时正确的处理好每一件事情。
1月份至5月份,连云港东海电信分公司的工程项目为ftth为主,为了配合业主参与“光网江苏”的竞赛计划,为了更好的为业主服务,在公司领导的安排下,顺利的拿到ftth工程项目上岗证。在ftth的工程建设项目的工作中,严格把握质量关口,定时定量的对已经完成改造的小区进行巡检,巡检过程中发现的施工工艺的问题,及时通知施工单位的相关负责人进行限时整改,同时以书面报告的形式上报业主。
巡检工作的主要资料为:布放主干光缆的布放路由是否与设计相符、新设ftth专用光交的安装质量、光交内光缆的熔接以、光分路器箱内皮线光缆的施工工艺及标志牌的粘贴。并定时的将ftth工作以周报的形式上报项目部,同时将ftth的工程进度与ftth完成的装机量以日报的形式上报业主。
随后下半年又开展宽带提速的计划,在宽带提速的计划里,其中有40个综合点,260个纯宽带点,并每月上报业主宽带提速的月份工作总价及下月的工作开展计划安排。对于有电缆拆旧的割接点,严格把握电缆拆旧部分,在施工前,要求施工单位对施工组织方案进行检查,对于施工单位提出存在材料使用变更的割接点,严格的根据施工现场进行查看。在电缆拆旧的工程中,以旁站的监理方式监理电缆拆旧过程,并记录电缆拆旧的电缆断长,在电缆入库时进行核实。
每一项工程开工前,对工程主要计划的工程项目包括工程所用的材料以及施工顺序做一些详细的了解,对现场施工的材料做明确的检验,根据建设单位交出的工程设计文本,与当日现场施工的情景做一个比较,最终向业主汇报当日的施工现场情景,让业主能够在第一时间了解工程的施工现场情景及施工进度20__年监理工作总结范文5篇工作总结。在监理过程中,我主要抓住质量、进度、安全方面的控制,主要强调事前控制,预防为主,结合施工过程的旁站,若发现质量及安全隐患,及时以口头通知形式令施工单位进行整改。
Time flashed, such as the gap between the gap, 20xx is nearing completion, review their contact with the project supervision in the past year's work, under the leadership of the care and guidance, with the help and encouragement of colleagues, through their own Unremitting efforts to master a certain amount of knowledge, but there are many deficiencies. Report on the work of this year are summarized as follows:
First, the main work of the annual personal content
In this year's work, I participated in the supervision of Dandong New District Hospital project, during which I hold the work while studying the attitude of the work, summed up the work of each process and points to find do not understand Problems, timely access to norms and to the leadership and colleagues advice, bit by bit accumulation of work experience.
The quality of work, according to supervision norms, engineering drawings and supervision rules strictly supervised. In the new district hospital project, most of the time I was at the site site, starting from the main project last year until now the external wall decoration and interior plastering. In the meantime found himself a lot of do not understand the place, through access to norms and other means to fill their vacancies in the area, the next encounter in a similar situation can be resolved independently. For the need to stand next to the station to do next to the station record, for the acceptance of hidden works in strict accordance with the norms of acceptance, if the acceptance is unqualified, is prohibited for the next process operations, such as October this year, B and E masonry projects exist Structural column and the level of tie beam reinforcement and bar reinforcement quality defects, the supervision found that there are quality problems after several oral notice of its rectification, the construction unit is always dragging the ladder to muddle through, and I strictly abide by the norms and supervision rules for supervision Work, its existence and refused to rectification problems issued a notice of supervision, and notify the construction unit project manager on the existence of some of the problems, and the construction unit of the masonry project submitted inspection materials strictly review, failure or Not the place where the rectification will never sign. The entry of materials, equipment, and so the original certificate test report quality inspection documents to confirm and confirm the approach to the steel after the witness to follow the construction side of the quality inspection station and a series of tracking work. As a result of the construction site of some of the funds, leading to the progress of construction and construction plans for a more serious lag, Du sum I have been in the middle of the coordination of construction units on schedule payment of funds, the construction unit reasonable arrangements for the process, that guarantee quality and duration. In this year's study and Du total care, I strictly control the quality of the materials, inspection and approval, sub-project acceptance must be done personally check, conclusions and in-kind must be consistent. For the acceptance of the project has been plausible, the test is not in place, go through the motions and other situations, Du total time to give guidance and help, I am more able to grasp the main points of the work.
Second, the work experience and lack of experience
Work experience and lack of supervision through this year's work, I feel as a supervisor only to do good behavior, strict self-discipline, into the team, respect for others, work seriously responsible for winning the respect of others. I met a lot of new things at the site. With Du's careful guidance and help, I learned a lot of new theories and practical experiences, which not only enrich the knowledge I could not learn in the field of specialization and atlas, but also broaden My knowledge of the industry. This year I learned a lot of professional and technical knowledge and interpersonal skills to coordinate the work of the community to continue to work hard to learn, put their minds, from the beginning of social work to change the passive state to adapt to social initiative State, in order to relax the mood, full of energy to continue into the work of tension. In future work I will be more efforts to learn the knowledge and practice of the professional capacity, and constantly sum up the lessons, and strive to do better.
The professional quality of our supervisors is uneven and the level is far from meeting the market demand. Most of the supervisors come from pure technology or construction enterprises. The knowledge structure is single, and the organization and coordination capacity is not enough. So I think I, as a young supervisor must pay attention to learning, to the site does not say outsiders, and can effectively solve the problems in the project for the construction unit advice and suggestions. Elite backbone to keep making progress, play a leading role, the new young people to study hard, pay attention to practice, do a little bit, focus on the accumulation of experience, should catch up as soon as possible.
As the real estate industry is not a special boom, the supervision industry, the employment situation as if I have a higher demand, first, the business level should be high, single-minded on the project. The second is to improve relations and coordination. I think that supervision is a service behavior, through their own professional work by the construction unit recognition, to obtain compensation to the site, we must straighten out the position, not to experts, to the law enforcement of the tone, told the construction unit in accordance with the specification procedures And laws and regulations should be how to do, but to be good at explaining the situation, so that the construction unit to understand the benefits of doing so. On the construction unit and not to managers themselves, should be clearly identified problems, said clearly to strengthen inspection and acceptance. In the process of the new district hospital, I do have a lot of things can not be resolved, then I will let the construction side, the project director to coordinate, to avoid my own to try to be tough.
Third, personal career development views and opinions on the company
Personal career development planning: to engage in supervision work, know too much too little, can not be satisfied with the reality, so I still have to learn to do more next year, in accordance with the work needs to gradually in-depth study of the professional knowledge, work to comply with the companyOf the management, enhance team awareness, further integration into our collective, and the use of spare time to learn more on the requirements of the standard to improve their business level. For myself, more for the company, I hope the company to organize some of our staff training, so that we can better do the job, so that we can do more for the company to do something, play a light and their own heat.
“勤奋工作,严谨科学,一丝不苟,公平公正”是本人自我要求。严格遵守公司的各项规章制度,能够按时出勤,遵纪守法,注重团结。在工作上,虚心向领导和其他同志请教,使自己受益良多。接受每项监理任务后,认真审阅图纸和设计文件,对图纸和设计文件中存在的问题或不明之处及时记录整理并通过建设单位同设计人员沟通以利于进行图纸会审和交底;
一、一年来监理工作的基本情景:
(一)、一阶段:驻中铁__局监理工作情景
监理工作时间:20__年4月6日至20__年7月27日
监理工作范围:厦深线标段dk125――dk131
主要监理设备情景:1、钻孔桩2、桥承台砼3、桥墩、台砼4、涵基础、身、盖板砼、沉降缝、防水层5、重点项目、部位现场旁站工作。
主要监理工作任务完成情景:
1、钻孔桩:71根。2、桥承台砼:21个。3、桥墩台砼:24个。4、涵洞:7座。涵洞防水层:20座。5、桥、涵工程检验批复核签字:687个。6、填写旁站监理记录:71份。7、填写监理日志:289份。
(二)、二阶段:驻中铁__局监理工作情景
监理工作时间:20__年7月28日至20__年12月20日监理工作范围:厦深线标段dk110――dk112
主要监理设备情景:1、钻孔桩2、桥承台砼3、桥墩身砼4、箱型钢筋砼梁5、重点项目、部位现场旁站工作。
主要监理工作任务完成情景:
1、钻孔桩:151根。2、桥承台砼:38个。3、桥墩身砼:39个。4、箱型钢筋砼梁2孔。5、桥工程检验批复核签
字:1105个。6、填写旁站监理记录:153份。7、填写监理日志:434份。
二、监理工作的做法和体会
1、做法:(1)、重点控制:钻孔桩施工,有设计变更的,没有收到设计单位批准签字盖章的变更手续,专业监理工程师不能进行检孔验收。(2)、制作后成品钢筋达不到设计尺寸要求的,经验收不合格的,不能使用。(3)、构件钢筋的规格、数量、绑扎尺寸不贴合设计要求的,不予验收。(4)、桥承台施工:没有收到检测单位签字盖章合格的桩基检测结果通知单,专业监理工程师不能进行承台钢筋骨架、模板加固验收。(5)、要保证砼施工质量,必须控制各种材料设计规格、施工配合比、坍落度、砼的和易性。(6)、初张拉、终张拉后,对锚具、夹片进行全部检查,到达合格。(7)、孔道压浆后,对锚孔进行全部检查,到达全部合格。
2、体会:(1)、要保证施工质量,严抓施工过程管理。(2)、认真执行全过程旁站重点项目、部位,做到心中有数,并能保证施工质量及安全。(3)、要做合格的专业监理,就必须全面学习、掌握监理规范要求,严格执行监理规范。
三、对监理工作的提议和意见
1、现场监理组,应专设测量组。对设备的重点高程进
行复测。保证设备的几何尺寸要求。
四、监理工作需要加强的地方
1、承包单位的技术人员,技术资质不够,技术本事差,不能完成施工技术指导工作。个别特种作业操作人员没有合格资格证书,作业质量达不到技术标准要求。所以,监理部门对施工单位技术人员、特种作业人员的资质审核进行严格控制。