第一篇:年终总结员工自我评价

20xx is coming to an end, the new year is nearing. project from mid-April 20xx formal construction to the present, of which the total number of steel pipe gantry workshop area of 9820 square meters, reserved warehouse door frame steel structure with a total area of 3840 square meters, the main body in early June 20xx, 20xx In mid-October across the board into use, the results with the company's leadership and the project department of the hard work of all employees are inseparable, but also our design department, Department of Materials, Engineering and other companies from top to bottom the result of unity and cooperation. In the whole construction process of the project, also deeply aware of the importance of teamwork, some of their own shortcomings, team harmony, etc. are the key factors affecting the smooth progress of the project. To this end, now the fourth quarter engineering work summarized as follows:

First, the schedule of progress

In the early stage of construction, under the consistent efforts of the whole company, the whole works well and the project has a good trend from safety, quality and progress. However, the processing of raw materials is an important link. , The audit of its materials related to the acceptance of the project safety, progress and other major links. (Materials often problems: 1, the material does not match the original drawings. Refer to the drawings one by one inspection to ensure that the material is correct; followed by raw materials in the production process to increase its efforts to monitor the company to ensure the correct production of materials for the Do not need to do a good job guarantee .2, raw materials approach the corresponding information is not perfect .It is recommended in the process of distribution of materials, the organization of the corresponding information staff to prepare the appropriate information on the vehicle distribution .3, good drawings review, the original design of common sense I would like to set up the company before the corresponding set of leadership, design, materials, engineering (recommended construction team in the conditions permitting, in the event of the construction site, The meeting will be responsible for the corresponding person in charge of a "pre-Conference" for the drawings, contracts, raw materials collection, material distribution co-ordination, design technology, on-site management issues to do a full range of analysis, co-ordination, Responsibilities, unity team strength.

In the foundation construction, the weather and other irresistible factors, is affecting the overall project successfully completed the biggest stumbling block, for this site managers should be based on the actual situation of the site, Party, weather and other factors to do the appropriate adjustments, reasonable arrangements for the construction schedule, Effective measures to catch up with the progress of the system. In this, I also deeply aware of their own shortcomings, the face of rainy weather can not reasonably organize workers to do the preparatory work for the latter part of the progress of the work, the corresponding conditions permitting the corresponding time delay caused by the progress of the project to step up , The corresponding surprise overtime is my own lack of management experience, can not be reasonable and effective deployment of workers to fully implement, so in the future work there are many places need to learn to grow.

Second, the construction safety

Site construction to be able to truly realize that production safety is a business and personal casting too fine in the premise and protection. We can realize the social attitude of "people-oriented, safety first", and can realize the importance and necessity of safety facilities, safety education and prevention. In the early stage of construction, do a good job of worker safety education, the signing of the corresponding labor contract, the security at the end, always bear in mind safety awareness, reserved warehouse project midway construction workers in the process of fall, as the scene responsible for people I can not Shirking responsibility, in the company's leadership under the same concerted efforts to take appropriate emergency measures for the injured in a timely and effective fight for the most valuable time to rescue, making the final health recovery workers to provide a strong guarantee for this I also reflect on their own deep, In the future construction site safety management work, always do a good job "Sambo, four, five edge", the construction of civilization, the safety education of workers, investigation of security risks as the focus of the work and the development of specific security Implementation of programs and measures for the smooth conduct of escort the project.

Third, the construction quality

A hundred years, quality-oriented. project, with the already completed, but still left a lot of thorny issues, such as: roof tile sun lap at the water leakage, wall windows leaks ... ... to the party's production has caused some impact, but also for the company The unnecessary loss, which I am deeply guilty, has been working to repair. In view of the above, I think in the construction process of the construction process to monitor their time, to avoid the workers paralysis thinking, to work with the team signed a technical agreement, if necessary, the quality of the agreement signed and develop the appropriate quality inspection cycle, found in the construction process quality defects The implementation of the implementation of the settlement, and truly quality problems in the dynamic management of quality inspection within. In strict accordance with national norms, standards and household acceptance criteria for the construction, the quality of the implementation.

Fourth, cost control and project advance payment

1. Cost control

1) material control: the construction of the early preparation of a detailed construction budget and material consumption plan, in the construction process according to site conditions changes, design changes, negotiation and other factors gradually improve. The construction team with the task list to receive materials, materials, out of the library has a detailed record. To ensure the normal supply of materials in the circumstances, to eliminate waste.

2) the use of new technology, reduce labor, improve efficiency to increase efficiency (combined with the actual situation on the site may be).

2. Project advance payment

And Group Co., Ltd. signed a construction contract in the terms of the project advances, the construction unit there arrears and delays, which makes the smooth progress of the project have also been affected, in view of this issue on-site managers to fully do a good job under the premise of engineering work to ensure, Party A to do a good job when the communication, to ensure that the payment of funds for the company to do the most effective back-up guarantee.

With the contract team signed a labor contract, we have never had arrears in accordance with the contract, with occasional delays, the scene also do a good job to appease the work to ensure that the final so that migrant workers safe and secure the work, happily home.

Looking back at this year's work there is growth and lack of clear analysis of their work in the shortcomings and advantages of understanding the gap, to accept the lessons learned in the future work to avoid weaknesses, improve and improve the construction method, which is a valuable asset for future work . Gradually improve their views and consciousness, and continuously improve the professional quality and level, strengthen the sense of responsibility, cultivate love and dedication, people-oriented, strengthen management and enhance team spirit. Let us Engineering Department of the results of the identification of "brilliant Zheng Tong, show iron army style."

第二篇:个人工作总结与自我评价

XX年,本人坚持以邓小平理论,“三个代表”和xx大重要思想为指导,自觉加强理论学习,认真学习党的xx大报告,刻苦钻研业务知识,努力提高理论知识和业务工作水平。遵纪守法,努力工作,认真完成领导交办的各项工作任务,在同志们的关心、支持和帮助下,思想、学习和工作等方面取得了新的进步。现将个人工作总结如下:

一、自觉学习党的精神,用先进政治思想武装自己的头脑

这一年来,我始终坚持运用马克思列宁主义的立场、观点和方法论,运用辩证唯物主义与历史唯物主义去分析和观察事物,明辨是非,坚持真理,坚持正确的世界观、人生观、价值观,用正确的世界观、人生观、价值观指导自己的学习、工作和生活实践,在思想上积极构筑抵御资产阶级民主和自由化、拜金主义、自由主义等一切腐朽思想侵蚀的坚固防线。热爱祖国,热爱中国共产党,热爱社会主义,拥护中国共产党的领导,拥护改革开放,坚信社会主义最终必然战胜资本主义,对社会主义充满必胜的信心。认真贯彻执行党的路线、方针、政策,为加快社会主义建设事业认真做好本职工作。工作积极主动,勤奋努力,不畏艰难,尽职尽责,在平凡的工作岗位上作出力所能及的贡献。

二、强化理论和业务学习,不断提高自身综合素质

我重视加强理论和业务知识学习,在工作中,坚持一边工作一边学习,不断提高自身综合素质水平。

一是认真学习“三个代表”重要思想,深刻领会“三个代表”重要思想的科学内涵,增强自己实践“三个代表”重要思想的自觉性和坚定性;认真学习党的xx大报告及xx届三中、四中全会精神,自觉坚持以党的xx大为指导,为进一步加快完善社会主义市场经济体制,全面建设小康社会作出自己的努力。

二是认真学习工作业务知识,重点学习公文写作及公文处理和电脑知识。在学习方法上做到在重点中找重点,抓住重点,并结合自己在公文写作及公文处理、电脑知识方面存在哪些不足之处,有针对性地进行学习,不断提高自己的办公室业务工作能力.

三是认真学习法律知识,结合自己工作实际特点,利用闲余时间,选择性地开展学习,学习了《中华人民共和国森林法》、《森林防火条例》、《中华人民共和国土地管理法》、《x区土地山林水利权属纠纷调解处理条例》、《反分裂国家法》,通过学习,进一步增强法制意识和法制观念。

三、努力工作,按时完成工作任务

一年来,我始终坚持严格要求自己,勤奋努力,时刻牢记党全心全意为人民服务的宗旨,努力实践“三个代表”重要思想,在自己平凡而普通的工作岗位上,努力做好本职工作。在具体工作中,我努力做好服务工作,当好参谋助手:

一是认真收集各项信息资料,全面、准确地了解和掌握各方面工作的开展情况,分析工作存在的主要问题,总结工作经验,及时向领导汇报,让领导尽量能全面、准确地了解和掌握最近工作的实际情况,为解决问题作出科学的、正确的决策。

二是领导交办的每一项工作,分清轻重缓急,科学安排时间,按时、按质、按量完成任务。

三是在接待来访群众的工作中,坚持按照工作要求,热情接待来访群众、认真听取来访群众反映的问题,提出的要求、建议。同时,对群众要求解决但一时又解决不了的问题认真解释,耐心做好群众的思想工作,让群众相信政府。在同志们的关心、支持和帮助下,各项服务工作均取得了圆满完成任务的好成绩,得到领导和群众肯定。

在过去的20xx年中我认真要求自己,在工作上在兢兢业业,取得了一定的进步,也得到了领导的信任和支持,但也发现了自己的一些缺点,我想在以后的工作中我一定会扬长避短,改进缺点,全面做好自己的工作,为人民的社会发展做出自己的贡献。

第三篇:个人工作总结与自我评价

201x年在全行员工忙碌紧张的工作中又临近岁尾。年终是最繁忙的时候,同时也是我们心里最塌实的时候。因为回首这一年的工作,我们会计出纳部的每一名员工都有自已的收获,都没有碌碌无为、荒度时间。尽管职位分工不同,但大家都在尽最大努力为行里的发展做出贡献。现将全年的工作情况向全行职工作以汇报:

一、重视业务核算质量,贯彻市行各项制度

今年是我们商业银行具有转折意义的一年,经过六年的打拼和积累,我行的羽翼已经逐渐丰满,准备更名挂牌,开始新的征程。然而,如果要使我们景星支行真正走在全行的前列,我们首先要做的是提高我们的业务能力。我行会计出纳部经常组织员工进行理论学习、岗位练兵。对市行传达的每一个文件、通知都认真贯彻。让员工树立主人翁精神,在工作中不推、不等、不靠,积极主动的完成自己的本职工作。我部一直坚持向时间要效益、向工作要质量。在核算上无重大差错事故。

二、加强日常工作管理,做好安全防范工作

我部的内部制度是比较健全的,各项工作都有明确分工,员工病、事假都严格按照规定及时请假。

在安全防范方面,对柜员日常工作所用的各种公章、名章都严格做到每日下库保管;对重要凭证的领用,都有专人负责;明确柜员的权限,不得擅自授权;对于市行要求上报的反洗钱可疑业务及时上报;随时提高警惕,杜绝诈骗。总之,我们要将一切防忠于未然,不做亡羊补牢的无用功,力求使全行的工作在稳健中谋发展。

三、培训员工操作能力,顺利通过柜员考试

今年是对全行职工个人业务考核要求最严格的一年,综合柜员上岗考试,直接关系到了每个员工的切身利益。行里不想让任何一个职工掉队,我会计出纳部,为了使每个员工顺利的通过考试,带领员工们利用工作之外一切所能利用的时间,积极准备考试。其间,我们组织了员工点钞,打字的基本技能考试。组织员工去培训中心进行业务上机打操作的练习。

有些员工工作、家庭的各方面负担都很重,考试给其带来了很大的心理压力,思想包袱很重。为帮助这样的同志,我部各个员工在考试期间,经常互相交流思想,一起钻研考试的命题,接受能力快的同志,耐心的给其他同志讲解。体现出了团结同志的精神,更让员工们感受到了行内大家庭的温暖。考试临近期间,大家都想争分夺秒的看书,但行里的各项工作是不可以停滞的。时间是自己的生命,因为这关系到自己是否有资格上岗;时间更是全行的生命,因为有那么多的客户需要我们为其服务。我部全体员工都义不容辞的选择了后者。在考试期间,没有人因为自己的利益,耽误本职工作,在最关键的时刻,我们看到了员工们的可爱之处。

四、全员拼“新百日会战”,向最后一季要成果

在临近年终的最后一季,市行“新百日会战”的各项指标下达到支行,支行下到各科部。我部所有职工都在第一时间积极的行动起来,配合行里完成各项指标。虽然“新百日会战”所大力宣传的各种产品大都是对个人客户的,但是我部员工只要有机会就向来办业务的客户宣传新产品。尤其是“得利宝”业务问世以后,我部员工向代发工资客户力推此项产品,滴水成河,为行内存款的上升做着力所能及的贡献。行领导多次强调,存款是责任,不是任务。就是想让职工转变思想,把行里的事当成自已的事,变压力为动力,当我们正视这个问题的同时,我们也感到了责任的重大和为行里工作的乐趣。员工们不再抱怨任务繁重,而是把“新百日会战”当成一个活动去积极的参与。

五、积累经验及时总结,稳扎稳打注重实效

这一年的工作和考核,又使我部员工得到了很多经验,当然也有很多教训。我们一直重视员工的整体业务水平的提高,大部分职工的工作质量都是达标的,但仍有业务水平参差不齐的现象存在。这样势必会对我行的整体服务形象造成一定程度的影响。所以,我部一旦接到上级部门的个别业务操作变更通知就及时的组织员工学习,减少核算差错。

六、在工作之中也存在很多不足,主要表现在:

1、服务上还达不到要求,有时态度生硬,不使用文明用语。

2、核算质量还存在很大差距,主要是因为工作不够认真细致。

以上是我部201x年全年的工作总结,向全行领导及员工作以汇报。这一年中的所有成绩都只代表过去,所有教训和不足我们每个人都牢记在心,努力改进。工作是日复一日的,看似反复枯燥,但我们相信“点点滴滴,造就不凡”。有今天的积累,就有明天的辉煌。

推荐专题: 自我工作评价 工作自我评价 自我工作总结评价

相关推荐
本站文档由会员上传,版权归作者所有,如有侵权请发送邮件至89702570@qq.com联系本站删除。
Copyright © 2010 - 千文网移动版
冀ICP备2020027182号